Skip to content

Location:  Plymouth, Minnesota

Project Overview:

EDI provided mechanical, electrical, technology, and sustainability engineering services for the Plymouth Public Library, a modern community resource designed to support learning, collaboration, and public engagement. The 31,000-square-foot facility was engineered to exceed Minnesota energy code requirements by more than 40% while achieving Minnesota Sustainable Buildings, Benchmarks and Beyond (B3) standards through the integration of innovative and energy-efficient building systems.

Project Highlights:

  • 31,000-square-foot public library
  • Minnesota B3 sustainable building design
  • Energy performance exceeding code requirements by 40%+
  • Ground-source geothermal heating and cooling system
  • Energy recovery ventilation
  • Daylight harvesting and occupancy-based controls
  • High-efficiency lighting and building automation systems
  • Integrated technology, security, and communications infrastructure
  • Sustainable, community-focused facility design
Back To Top